Power Booster
With many utilities caught in a vise between semiobsolete facilities and demands for cleaner power, the $578 million Manchester Street repowering project is setting an example for an aging...

Verification of Geotechnical Grouting
This volume, Verification of Geotechnical Grouting, consists of a committee report from the ASCE Committee on Grouting and relevant juried...

Control Model for Robotic Backhoe Excavation and Obstacle Handling
Excavation of soil and rock is a high volume and repetitive construction operation. Robots, which are suitable for incessant and repeated manipulations, can find many potential applications....

Monitoring of Structures During Repair of Underground Utilities
A collapse of underground utilities at a power plant required the constant monitoring of the surrounding structures during excavation and replacement of the damaged pipes. A computer-based...

Civil Engineering and Civic Monuments: The Commissioning, Design and Public Perception of Urban Infrastructure Projects
This paper analyzes the roles that some infrastructure projects play as civic monuments and public places, and how these functions interact with their technical performance and utility....

Nakajima Subsurface Dam
A new water resource is generated by a subsurface dam. This paper presents the design, construction, and monitoring of a test subsurface dam in an alluvial valley of an island for both...

Activity Based Costing in Water Resources Management
This paper examines the relatively new accounting tool, Activity Based Costing (ABC), and describes its potential application in water resources planning, management, and operations. The...

The Cost of Water Reuse is a Benefit to All
This paper discusses the development of a nonpotable water pricing policy as part of the East Bay Municipal Utility District's long-range comprehensive planning effort entitled the Water...

Lesson Learned form Implementing M&I Optimal Water Delivery
Few municipal water delivery systems are truly optimized to deliver a quantity of water at the least cost. Both the University of Kentucky and Memphis State University have attempted to...

An Integrated Approach to the Real-Time Control of Water Supply and Distribution Systems
In recent years, real-time automated operation and control schemes have been implemented for a number of water supply and distribution systems with varying degrees of success. This paper...

Use and Abuse of Settlement Analysis
Terzaghi's concept of settlement analysis included comparison of prediction with reality and investigation of the causes of the differences. Present usage is often limited to prediction....

Settlement of a 15-Meter Deep Fill Below a Building
The site for a building in western Pennsylvania was undermined, with the mine base about 15 m below planned final grade. Rock above the mine was highly fractured and of poor quality, indicating...

Compaction Grouting Stops Settlement of an Operating Water Treatment Plant
In early 1978, about a month into full-time operation, the new filter plant building for the water treatment plant for the City of Glenwood Springs, Colorado, experienced distress due...

Removal of Arsenic by Enhanced Coagulation and Membrane Technology
The U.S. EPA is promulgating a new MCL for arsenic based on epidemiology studies. The concern from the water industry is that the new MCL will be significantly lower than the current MCL...

Nation-Wide Bromide Occurrence and Bromate Formation Potential in Drinking Water Supplies
The average bromide concentration obtained in a survey of 101 nationwide drinking water utilities was almost 100 ?g/l. Whereas previous studies have targeted ozonation studies on waters...

Pipe Utility Evaluations With the Aid of GIS
Geographical Information Systems (GIS) are starting to be used on a day to day basis to solve community problems and optimize the use of their valuable resources. One engineering application...

Revenue Enhancement for Water and Wastewater Systems
This proceedings, Revenue Enhancement for Water and Wastewater Systems, examines techniques used in the water and wastewater utility industry...

Geotechnical Baseline Reports
The greatest percentage of disputes in underground construction results from subsurface conditions that are different than from what is indicated in the contract. Adding geotechnical baseline...

Sludge Under Pressure
Few wastewater engineers ever have to deal with high-pressure pumping. In San Diego, however, city engineers will soon oversee a 100,000 ft long psi main that will transport sewage sludge...

Meshing Computer Technologies
A growing number of clients, especially state DOTs, are requesting computer-aided design (CAD) documents in a specified format, leaving consulting firms to wonder how many different CAD...

 

 

 

 